.

Icelandic fishing company is considering renewing fresh fish trawlers

HB Grandi and the Turkish shipyard Celiktrans Denis Insaat Ltd. have reached an agreement for Celiktrans to fully design and build a model of a fresh fish trawler for tank testing.



Alfreð Tulinius and Bárður Hafsteinsson, naval engineers at Nautic EHF., are to be responsible for the design and the testing, is expected to be fully completed by june 2014.

A decision will subsequently be made by the parties as to whether to embark on building three fresh fish trawlers.

If an agreement is reached, the first trawler to be delivered will arrive in mid-year 2016. A draft appearance design of the trawlers, which are 55 m in length and 13.5 m wide, has already been completed.

The Ceiliktrans shipyard currently has a pelagic fishing vessel under construction for HB Grandi.

FiskerForum.com



WorldFishingToday - 19-03-2014



Holland Fisheries Event 2018
Fiskerforum Media Info
Fiskerforum Media Info
Fiskerforum Media Info
Fiskerforum.com Media Info
Atlantic Fair 2019 - UK
Pronomar
Atlantic Fair 2019 - UK
Fibras Industriales S.A.
Piet Brouwer elektrotechniek
Fiskerforum.com Media Info
Kynde og Toft
Granly Diesel A/S
Quiksling - Water Rescue

© 2019 • Fiskerforum • CVR 32663192 • www.fiskerforum.cominfo@fiskerforum.com • Phone +45 9731 1946 privacy policy | disclaimer

FiskerForum is published by Apollomedia